Pre-assembled cable harnesses vs. on-site assembly
Time is money – this old saying is especially true when installing solar power plants. Cabling is a critical cost factor that is often underestimated. But this is precisely where there is significant potential for savings: up to 20% of the total costs can be saved by using pre-assembled cable harnesses. How is this possible?
The hidden cost drivers of classic cabling
On-site assembly presents numerous challenges that have a direct impact on project costs. The time-consuming process of individually measuring, cutting and assembling each individual cable requires not only specially trained personnel, but also the appropriate special tools. Added to this are unavoidable material losses due to inaccurate cutting and quality fluctuations due to changing environmental conditions. Particularly critical: errors during installation, such as incorrect torque or poor crimping, can make expensive rework necessary.
The systematic approach: pre-assembly
Prefabricated cable harnesses offer a well-thought-out solution that increases efficiency on several levels. Installation is based on the plug-and-play principle, which drastically reduces assembly times. Special tools are no longer required, and weather-related delays are also significantly minimized.
Material efficiency benefits from precise digital planning: exact length calculations and optimized cable routing reduce waste to a minimum. Machine production under controlled conditions guarantees consistently high quality. Every work step is recorded, from crimping to final screwing.
Focus on long-term operational reliability
The added value of pre-assembled cable harnesses is particularly evident in long-term operation. The documented quality of each individual connection, manufactured under optimal conditions, significantly minimizes the risk of failure. The complete documentation not only facilitates any warranty claims, but also simplifies scheduled maintenance through uniform standards.
Economic Efficiency in Practice
The cost savings of up to 20% result from the interaction of various factors. The significantly reduced assembly time on site plays a central role. Added to this is the minimization of material waste through precise prefabrication and the reduced coordination effort during installation. Particularly important: Expensive rework, which is often required for on-site assembly, is almost completely avoided.
Conclusion: The difference is in the details
The analysis clearly shows: Prefabricated cable harnesses are much more than an alternative to classic installation. They are a decisive factor for the economic viability of modern solar projects. The key to success lies in professional planning and prefabrication. The full efficiency potential can only be exploited if the cable harnesses are precisely tailored to the specific project requirements.