Assembled cable harnesses
Plug-and-Play is our DNA
Time savings thanks to factory-tested systems. Pre-assembled cable harnesses eliminate time-consuming on-site installation. Plug-and-play instead of time-consuming individual installation.
Systematic production under controlled conditions. Each cable harness undergoes multi-stage quality checks. Precise labeling prevents mix-ups.
Reduced personnel costs thanks to optimized assembly times. No material waste thanks to precise pre-assembly. Minimized sources of error mean maximum project efficiency.
"Pre-assembled cable harnesses are our promise to make projects more efficient. We think in terms of installation and eliminate sources of error - this creates measurable benefits on the construction site."
Innovation in action
View all postsAchieving Great Things Together
"When I walk through the plant today and see how smoothly everything is running, it makes me really proud," says Michael Langner with a satisfied smile. As a cabling expert at GSW Gold Solarwind, he knows the challenges of large solar projects only too well. "In the past, cabling was often the point that gave us headaches. Today, it is one of our biggest success factors."
The right products for complicated applications: Floating PV systems in Holland
Floating PV systems open up new possibilities for utility-scale PV installations, for example for hydroelectric power plants and treatment, irrigation reservoirs or aquaculture farms. They offer higher power generation through cooling of the water and reduced dust formation, less line losses and environmental impact.
One system, maximum efficiency
Vorkonfektionierte Kabelbäume definieren industrielle PV-Installation neu. Entdecken Sie die weiteren Komponenten des HIS Connect Systems für Ihre maßgeschneiderte Integration.
Ready to connect? Your efficiency is what drives us. Let's talk about your next project.